PMP Exam Simulator

alarm icon
3h 50m 0s
info iconPMP exam lasts 230min and has 180 questions
info iconUse acceleration to have extra 30m in reserve on exam

lock iconScope Management

You are managing a project to renew an old swimming pool. One of the team members, on his own initiative, applied non-slip treatment that changed the chemical nature of the surface, making it less slippery even when the surface is wet. The team member thought that it was absolutely necessary for safety reasons. The original plan did not include the cost of this surface treatment. This is an example of which of the following?